https://defuijk.com
  • Home
  • ABOUT DFMC
  • APPROACH
  • SERVICES
  • PROJECTS
  • NEWS & MEDIA
  • CONTACT
  • Beatrice Sluice
  • Beatrice Sluice
  • Beatrice Sluice

Beatrice Sluice

  • CLIENT: Rijkswaterstaat
  • POSITION: Project manager
  • PERIOD: 1999 – 2000
  • LOCATION: Nieuwegein
  • PROJECT SCOPE (ELECTROTECHNICAL): > 1 MILLION
  • URL: CLICK HERE

Description of duties:
Here I was responsible for the construction of the electrotechnical installations. Unique elements of the project included the new cabling for the sluice control system, the installation of new software (a first for the client) and the fine tuning of all the components.

Share
  • Twitter
  • Facebook
  • LinkedIn

Related Works

  • Maasvlakte Plaza

    Maasvlakte Plaza

    Infrastructure
  • Roer and Swalmen Tunnel A73

    Roer and Swalmen Tunnel A73

    Infrastructure
  • AWZI-Bodegraven

    AWZI-Bodegraven

    Infrastructure
  • Roer Tunnel Water Mist Systeem

    Roer Tunnel Water Mist Systeem

    Infrastructure

Contact

De Fuijk Management & Consultancy B.V.

Tel: +31 (0) 6 28 044 990

E-mail: hennie@defuijk.nl

Copyright © 2022. De Fuijk . All rights reserved
Developed by www.ziba-atelier.com