https://defuijk.com
  • Home
  • ABOUT DFMC
  • APPROACH
  • SERVICES
  • PROJECTS
  • NEWS & MEDIA
  • CONTACT
  • Souterrain Tram Tunnel
  • Souterrain Tram Tunnel
  • Souterrain Tram Tunnel

Souterrain Tram Tunnel

  • CLIENT: Tram Kom
  • POSITION: PROJECT MANAGER
  • PERIOD: 2000 – 2004
  • LOCATION: THE HAGUE
  • PROJECT SCOPE (ELECTROTECHNICAL): > 10 MILLION
  • URL: CLICK HERE

Description of duties:
Complex project with civil-technical challenges due to groundwater problems. As project manager I was responsible for safe and moisture-resistant electrotechnical installations. I engaged in intensive consultations with the stakeholders on constructional issues.

Share
  • Twitter
  • Facebook
  • LinkedIn

Related Works

  • Beatrice Sluice

    Beatrice Sluice

    Infrastructure
  • VDR Schiphol

    VDR Schiphol

    Infrastructure
  • AWZI-Bodegraven

    AWZI-Bodegraven

    Infrastructure
  • Maasvlakte Plaza

    Maasvlakte Plaza

    Infrastructure

Contact

De Fuijk Management & Consultancy B.V.

Tel: +31 (0) 6 28 044 990

E-mail: hennie@defuijk.nl

Copyright © 2022. De Fuijk . All rights reserved
Developed by www.ziba-atelier.com